The Montana Department of Transportation (MDT) is seeking comments on a proposal to design and rebuild/ rehabilitate approximately 2 miles of 1st Avenue North from the intersection with Division Street to the intersection with North 9th Street in Billings. Proposed work includes a combination of rehabilitation and reconstruction that is intended to address poor pavement condition and substandard curb, gutter, and sidewalk. Proposed work includes enhancements upgrades to curb, gutter, pavement, lighting, and a signalized intersection located at North 13th Street. Construction is tentatively planned for beyond 2020 depending on completion of design, right-of-way acquisition, and availability of funds. New right-of-way and relocation of utilities may be required.

Market Update

1 DOW 20,656.58
-4.72 (-0.02%)    
2 S&P 2,345.96
-2.49 (-0.11%)    
3 NASDAQ 5,817.69
-3.95 (-0.07%)    
4 MDU 27.10
-0.08 (-0.29%)    
5 SWC 17.41
+0.08 (0.46%)    
6 EBMT 20.15
+0.25 (1.26%)    
7 FIBK 38.85
+0.30 (0.78%)    
8 GBCI 32.71
+0.12 (0.37%)